Details for WYDOT Budget Office - Ad from 2019-09-12

TRANSPORTATION COMMISSION OF WYOMING NOTICE TO CONTRACTORS The following bidding and contract documents for construction of the projects listed herein will be received by mail or delivered to the Wyoming Department of Transportation Office at 3200 Elk Street, Rock Springs, Wyoming, 82901 - Phone - (307)352-3000, or delivered on the morning of the letting at the Rock Springs Holiday Inn, 1675 Sunset Dr. in Rock Springs, Wyoming 82901 Phone (307) 382-9200. It is the responsibility of the Contractor to ensure that the bid envelope is received by Contracts and Estimates personnel, which can be verified by calling 307-777-4487. Sealed bids will be received until 9:00 AM, October 10, 2019, immediately after which time the Proposals will be publicly opened and read at the Rock Springs Holiday Inn in Rock Springs The Department of Transportation places the responsibility for delivery of the bids to the letting with the bidder. Bidders may elect to have their bids delivered by any delivery service or may hand carry their bids to the above street address. Any bids received at the letting after 9:00 AM on the above date will be returned to the bidders unopened. The Wyoming Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Plans and proposals, cross sections, computer earthwork listings, and soils profiles can only be obtained in electronic format from the QuestCDN website, This website link is located near the top of WYDOT’s bid letting page at https://ipd.exevision.com/wydot/ws/ To purchase and download desired plans, click on the QuestCDN.com box. No refunds will be available for downloaded materials. The Affidavit of current work status (Form E-103) must be submitted each month to obtain the bid proposal envelope. Proposals received in other than the official envelope will not be considered or read. For questions please contact the Contracts and Estimates office at (307) 777-4487. Proposal forms and Special Provisions will be included with the plans at no extra cost. CONTRACTORS DESIRING TO LOOK OVER THE PROJECTS BEFORE BIDDING ARE REQUESTED TO MAKE AN APPOINTMENT WITH THE ENGINEER IN CHARGE 24 HOURS IN ADVANCE. The Engineers showing the respective projects are as follows: PROJECT PLAN PROJECT ENGINEER ADDRESS TELEPHONE COST NHPP-N432055 & John Leahy, P.E. Newcastle 746-3551 $20.00 NHPP-RF-N432056 Federal Projects NHPP-N432055 & NHPP-RF-N432056 combined involving grading, draining, placing bases, bituminous pavement surfacing, plant mix wearing course, electrical, fencing and miscellaneous work on approximately 14.70 miles on WYO 59 beginning at RM 85.65 between Douglas and Gillette in Campbell County. NHPPI-I254155 Chad Aagard, P.E. Casper (307)473-3225 $20.00 Federal Project NHPPI-I254155 involving grading, milling plant mix, placing crushed base and bituminous pavement surfacing (recycle), plant mix wearing course, miscellaneous bridge work and miscellaneous work on approximately 8.60 miles on I-25 beginning at RM 210.90 between Casper and Kaycee in Natrona County. SCP-TC-P261029 Steve Cook, P.E. Laramie (307)745-2115 $20.00 State Project SCP-TC-P261029 involving placing pit run subbase, bituminous pavement surfacing, chip seal and miscellaneous work on approximately 10.60 miles on WYO 230 beginning at RM 11.50 between Laramie and Woods Landing in Albany County. NHPPI-I805178 Steve Cook, P.E. Laramie (307)745-2115 $20.00 Federal Project NHPPI-I805178 involving grading, milling plant mix, placing crushed base and bituminous pavement surfacing, high performance wearing course, bridge rehabilitation and miscellaneous work on approximately 5.60 miles on I-80 beginning at RM 318.84 between Laramie and Cheyenne in Albany County. PEG2031, Jennifer Hoffman, P.E. Kemmerer (307)877-3239 $20.00 ARSCT-PEG3A21, ARSCT-PEG3A22 & ARSCT-PEG3A23 State Projects PEG2031, ARSCT-PEG3A21, ARSCT-PEG3A22 & ARSCT-PEG3A23 combined involving crushing and stockpiling of crushed surfacing material, salt mixing of designated stockpiles and miscellaneous work at various locations in Transportation District 3 in Lincoln, Sublette, Sweetwater & Uinta Counties. STP-PM-B203017 & Clint Lockman, P.E. Rock Springs (307)352-3039 $20.00 CMP-PM-W413005 Federal Projects STP-PM-B203017 & CMP-PM-W413005 combined involving crack sealing and surfacing and miscellaneous work on approximately 86.81 miles at various locations in Transportation District 3 in Lincoln, Sweetwater & Uinta Counties. STP-PM-B201002 Steve Cook, P.E. Laramie (307)745-2115 $20.00 Federal Project STP-PM-B201002 involving crack sealing and miscellaneous work on approximately 92.00 miles at various locations in Transportation District 1 in Albany, Carbon & Laramie Counties. STP-PM-B205013 Erik Smith, P.E. Lander (307)332-4151 $20.00 Federal Project STP-PM-B205013 involving crack sealing and miscellaneous work on approximately 80.40 miles at various locations in Transportation District 5 in Fremont & Hot Springs Counties. Each Proposal must be accompanied by a bid guaranty, which may be either an electronic bid bond or a cashier’s check, made payable to the Transportation Commission of Wyoming in the minimum amount of ten percent of the contractor’s bid. Minimum wage rates for all preceding projects have been predetermined by either the U.S. Secretary of Labor or Transportation Commission of Wyoming and are set forth in the Wage Determination Decision, which is included in the special provision for each project. TRANSPORTATION COMMISSION OF WYOMING Published: September 12, 19, 26 & October 3, 2019 Legal No: 58598

You may be interested in